AI-Driven BOQ & Work Schedule Engine
Instantly extract material quantities from drawings, automate cost analysis, and generate dynamic work schedules with forensic precision.
Forensic Intelligence Console
>>> System Initialization OK.
>>> CrownateStudio Neural Extractor loaded.
>>> Chat with the node below, or upload a drawing layer.
Upload Architectural/Engineering Drawing (.dwg, .pdf) for AI Analysis
Project Context: Apex Residential Tower C
ID: PRJ-993-8X
Location: District 4
Client: Horizon Corp
Live Performance Grid
Total Project Cost
$0.00
Total Rows
124
Verified Output
98
Cost Variance
+4.2%
Work & Material Schedule Matrix
| Ref | Structural Description | Unit | Qty | Rate | Amount | Node State |
|---|---|---|---|---|---|---|
| 1.1 | $0.00 | Verified | ||||
| 1.2 | $0.00 | Verified | ||||
| 1.3 | $0.00 | Pending |
Nigerian Material Database
-
Dangote 3X Portland Cement
Size: 50kg Bag | Supplier: Obajana | Qty: 4,000Vetted -
BUA Cement
Size: 50kg Bag | Supplier: BUA Group | Qty: 2,500Vetted -
High Tensile Ribbed Rebar
Size: 16mm & 20mm (12m) | Supplier: African FoundriesUnlinked
Equipment & Labor Allocation
-
Tower Crane (10T) - 45 Days$4,500
-
Skilled Labor Force - 1,200 Hrs$36,000
Variation Orders
| ID | Description | Impact | Date | Del |
|---|---|---|---|---|
| VO-101 | Added Earthworks Depth | +2400.00 | Oct 12 | |
| VO-102 | Reduced Rebar Specs | -1100.00 | Oct 15 |
Financial Analysis
Subtotal Computation$0.00
Overheads Risk Set (15%)$0.00
System Profit Margin (10%)$0.00
Grand Total$0.00