How Free Property Pre-Evaluation Works
CrownateStudio allows any individual, investor, or homebuilder in Nigeria to analyze a property instantly without paying fees or creating an account.
From Location to Sealed Report in Minutes
Property Typology & Use
Identify whether the parcel is residential land, a completed building, commercial plaza, or industrial warehouse to calibrate base valuation models.
Geographic Triangulation
Our database maps your State, LGA, and Ward to regional land transaction indexes across all 36 Nigerian States and the FCT.
GPS & Setback Detection
Real-time device coordinates or interactive map pins identify potential road widening setbacks, power grid corridors, and drainage buffers.
Infrastructure Quality
Road accessibility, power supply stability, drainage infrastructure, and perimeter security are weighted to adjust indicative market values.
Automated Docket Intake
Supplied survey plans and deed extracts are indexed securely for preliminary data completeness scoring and title risk detection.
Secure Multi-Channel Delivery
An interactive digital evaluation report is generated with a unique reference (e.g. PEV-2026-LAG-8F42K7) and sent via WhatsApp or Email.
What the Free AI Evaluation Delivers
✅ What Free Pre-Evaluation Provides
- Indicative Value Range: Upper and lower benchmark prices based on regional transaction data.
- Confidence Score: Algorithmic score reflecting the depth and completeness of supplied information.
- Infrastructure Impact Matrix: Quantified adjustments based on road, power, and water assets.
- Preliminary Risk Screening: Highlights missing documentation, zoning anomalies, and potential acquisition buffers.
- Actionable Next Steps: Objective guidance on which licensed specialists to consult next.
❌ What Still Requires Licensed Verification
- Statutory Title Authentication: Physical folio inspection at the State Lands Registry (requires a qualified Lawyer).
- SURCON Beacon Charting: Certified coordinate plotting at the Surveyor General Office (requires a Registered Surveyor).
- Building Plan Approvals: Statutory permit verification with LASPPPA / Ministry of Physical Planning (requires a Town Planner).
- Structural Integrity Testing: Non-destructive rebound hammer tests on physical concrete (requires a Structural Engineer).