WHAT ARE YOU WORKING WITH?
Select your drawing type to optimize analytical extraction, or let our engine detect it automatically.
ARCHITECTURAL
Floor plans, elevations, sections, details, schedules, and door/window tags.
ANALYSE ARCHITECTURAL →STRUCTURAL
Foundations, columns, beams, slabs, stairs, and reinforcement schedules.
ANALYSE STRUCTURAL →MEP
Mechanical, electrical, plumbing, fire protection, and HVAC schematics.
ANALYSE MEP →CIVIL / SITE
Site layout, stormwater drainage, access roads, utilities, and external works.
ANALYSE SITE →DRAWING SET
Upload multiple coordinated disciplines together for cross-referencing.
ANALYSE DRAWING SET →I DON'T KNOW
Let the system inspect title block and linework to identify the drawing type.
IDENTIFY FOR ME →SOIL REPORT REVIEWER
Upload a soil or geotechnical report. Check internal consistency, location alignment, duplication indicators and independent geological references.
REVIEW SOIL REPORT →DROP YOUR DRAWING HERE
PDF, JPG, PNG and supported drawing formats. No CAD or technical experience required.
Drag & Drop Construction Drawings Here
or click to browse files from your computer or device
CONSTRUCTION DRAWING KNOWLEDGE HUB
Fundamental principles for reading, coordinating, and managing technical building drawings in Nigeria.
What Is a Construction Drawing?
A construction drawing is a precise technical document that translates design intent into physical building instructions. It includes floor plans showing spatial arrangements, elevations illustrating facade treatments, sections revealing vertical relationships, and detailed schedules specifying door and window types.
How to Read an Architectural Drawing vs a Structural Drawing
Architectural drawings focus on how people use the space: room boundaries, door swings, window light openings, and floor finishes. Structural drawings focus on how gravity and wind loads are carried safely to the earth: foundations, columns, beams, reinforced concrete slabs, and reinforcement steel bar schedules.
Why 70% of Building Defects in Nigeria Trace Back to Drawing Errors
In Nigeria, building collapses and severe structural cracking are frequently triggered long before the first bag of cement is mixed. Key causes include: starting construction without geotechnical soil test data (e.g. in Lekki, Ajah, or Port Harcourt swamp soils), building multiple storeys from unverified architectural drafts without a COREN-certified structural engineer, and contractors guessing reinforcement steel sizes on site. Pre-construction drawing intelligence detects missing foundation specifications and load paths before capital is deployed.
Lagos State LASPPPA & LASBCA Building Approval Checklist
To obtain a valid Planning Permit from the Lagos State Physical Planning Permit Authority (LASPPPA) and pass Lagos State Building Control Agency (LASBCA) inspections, your drawing set must contain: (1) Architectural drawings signed and sealed by an ARCON architect with mandatory front, rear, and side setbacks; (2) Structural drawings and calculations signed by a COREN structural engineer with an attestation letter; (3) Mechanical & Electrical (MEP) service drawings; (4) Certified survey plan; and (5) Subsoil geotechnical investigation report for developments exceeding 2 floors or on reclaimed soils.
The Danger of Hacking Structural Concrete Beams for MEP Plumbing Pipes
A widespread construction mistake across Nigerian building sites is casting reinforced concrete floor slabs and beams without pipe sleeves, and then allowing plumbers or electricians to hack or chisel through load-bearing beams with sledgehammers to pass 4-inch (100mm) toilet soil pipes. This destroys the tensile steel and compressive concrete zone, drastically weakening structural capacity. Coordinated drawing intelligence identifies service clash points so pipe sleeves can be cast into the formwork before pouring.
What Does a Title Block Tell You?
The title block in the bottom right corner or right margin acts as the drawing's passport. It confirms the registered project name, sheet number, drafting scale (e.g., 1:100), revision status, approval signatures, and the lead consulting firm responsible for the drawing's contents.
How Drawing Intelligence Bridges into BOQ and Project Control
Every line on a drawing corresponds to a material quantity on site. By measuring room perimeters, concrete column volumes, and openings, drawing intelligence extracts preliminary quantities that flow seamlessly into Crownate QS & BOQ Cost Intelligence for pricing verification, and establishes the baseline for Project Control milestones.