KNOW WHAT YOUR PROJECT SHOULD COST.
Upload or build your BOQ, compare rates against current Nigerian market intelligence, and identify items that may require pricing review before you approve the project cost.
Import existing project schedules or build line items manually across 20 construction phases.
| # | Description | Specification | Quantity | Unit | Rate (₦) | Amount (₦) |
|---|
Searchable Nigerian construction materials pricing verified across Lagos, Abuja, Port Harcourt and key regional hubs.
Compare quotes from multiple contractors on Scope, Completeness, Unit Rates, and Risk.
Key commercial, logistical, and technical reasons prices vary in Nigerian construction.
0.55mm aluminium costs significantly more than 0.45mm. Vitrified tiles differ substantially from full-body porcelain. Always check exact specifications.
A price in Lagos near maritime ports reflects different logistics from Abuja or Kano. Local quarry haulage and bad road access add substantial costs.
Does the rate include offloading, site storage, cutting wastage (5–12%), and installation labour? Or are those billed under separate sections?
In volatile markets, suppliers hold quotes for 7 to 14 days. Contractors often include a price volatility buffer if payment terms are delayed.
If you are committing significant capital and require a registered Quantity Surveyor to independently audit drawings, measure schedules, verify rates, and prepare a tender report, request a Crownate Professional Review.
Frequently asked questions and guides on BOQ rate verification in Nigeria.